PROJECTS
Maintenance & repair/reconstruction of Gangway-Cum-Pontoon Jetty at Golabari in the District of Howrah.
Description of project:- New pontoon design drawing and construction, New pontoon installation, mooring of pontoon, 90 lbs rail driving job for shoulder support, Gangway length extension job, Sal wood supplying & fitting job, Gangway, Gangway roller & Yoke assembly repairing, greasing, painting job performed under instruction & satisfaction of Engineer-in-Charge.
Irrigation & Waterways, Govt. of WB
Project commencement date:- 12.03.2018
Project completion date:- 22.04.2019
Project cost:- Rs, 1,41,06,946/-
Reconstruction / renovation / refurbishing of Panihati Jetty, satisfying shipbuilding practice & Statutory authority requirements in the District of North 24 Parganas on the river Hooghly (NW-1).
Description of project:- Pontoon, Gangway, Gangway roller & Yoke assembly repairing, greasing, painting & mooring job (with supply of 01 No. 2.5 MT Anchor) performed. Fabricated Grill gate at gangway entry installed. For link new steel stair installation job & MS plate installation job done. 1st class brick, concrete, plaster job done. Electrical wiring & light fixing job performed. All job performed under instruction & satisfaction of Engineer-in-Charge.
Irrigation & Waterways, Govt. of WB
Project commencement date:- 20.09.2017
Project completion date:- 15.02.2018
Project cost:- Rs, 8850658/-
Construction and Delivery of Six Nos. 80 PAX Steel Mechanised Boats to ply in Inland Water ways of West Bengal
Description of project:- Construction of Steel hull, wheel house and super structure, Engine installation, Propeller and shaft with their bushes installation, rudder installation, painting, lunching of vessel as per drawing and stage survey.
West Bengal Transport Corporation Ltd.
Project commencement date:- 26.04.2018
Project completion date:- 22.08.2018
Project cost:- Rs, 1,95,60,000/-
Construction and Delivery of Seven Nos. 100 PAX single screw self propelled wooden hull Ferry vessel to ply in Inland Water ways of West Bengal. Phase-II
Description of project:- Construction of wooden hull, wheel house and super structure, Engine installation, Propeller and shaft with their bushes installation, rudder installation, painting, lunching of vessel as per drawing and stage survey
West Bengal Transport Infrastructure Development Corporation Limited.
Project commencement date:- 15.01.2018
Project completion date:- 12.10.2018
Project cost:- Rs, 4,34,79,880/-
Dry – dock repair of SL Dihang
Description of project:- Blocking of vessel, Gauging of entire vessel, crop renewal of steel, overhauling of Main engine, DG set, repairing of propeller, shaft, rudder, shaft and their bushes, painting of entire vessel, pump repairing, valve repairing, electrical work in entire vessel and other work mentioned in the BOQ, un-blocking and handover after survey.
Inland Waterways Authority of India (Kolkata)
Project commencement date:- 03.05.2024
Project completion date:- 18.09.2024
Project cost:- Rs, 17,67,622/-
Construction/ Reconstruction of Gangway cum Pontoon Jetty satisfying ship building practice and statutory authority requirements including RCC cast-in-situ bore pile/rail pile in tidal condition of river including yoke staging platform, link platform and other infrastructure development works as per approved drawings Manirampur Ferry Ghat, in the District of North 24 Parganas and at Cossipore Ferry Ghat, in the District of Kolkata on the river Hoogly (NW1).
Description of project:- :- Design, drawing & new construction of pontoon, Gangway and yoke-assembly, Survey, soil test, design, drawing of project, RCC pilling, Link platform construction, yoke staging, ticket counter, passenger shed, Toilets, Passenger amenities, PA & electrification work for smooth ferry service.
WEST BENGAL INLAND WATER TRANSPORT, LOGISTICS AND SPATIAL DEVELOPMENT PROJECT
Project commencement date:- 01.08.2021
Project completion date:- 30.04.2023
Project cost:- Rs, 8,02,04,021/-
Construction of Gangway Pontoon type LCT Jetty at Biratbazar, North bank of river Pankhinala under Patharpratima Block.
Description of project:- :- Design, drawing & new construction of pontoon, Gangway and yoke-assembly, Survey, soil test, design, drawing of project, RCC pilling, Link platform construction, yoke staging, ticket counter, passenger shed, Toilets, Passenger amenities, PA & electrification work for smooth ferry service.
West Bengal Transport Corporation Limited
Project commencement date:- 12.07.2023
Project completion date:- 31.08.2024
Project cost:- Rs, 7,87,03,667/-
Repairing and painting of 24 nos. Navigational buoy
Description of project:- :- Blocking of vessel, Gauging of entire vessel, crop renewal of steel, overhauling of Main engine, DG set, repairing of propeller, shaft, rudder, shaft and their bushes, painting of entire vessel, pump repairing, valve repairing, electrical work in entire vessel and other work mentioned in the BOQ, un-blocking and handover after survey.
Syama Prasad mookejee port Kolkata
Project commencement date:- 29.06.2022
Project completion date:- 01.12.2023
Project cost:- Rs, 79,22,786/-